Here's A Few Of Our Recent Projects

Kane Gulch Ranger Station

Complete

Blanding, UT
Demolition and removal of the existing ranger residence unit including
foundation and build new housing unit on the site of the demolished
residence.

Water Storage Tanks

Spring of 2018

Cave Spring, NV
Sandblasting and recoating of both the exteriors and interiors of two, 50,000 gallon steel water tanks.

Papi Runway 07 Installation

July, 2014

Spokane International Airport
Spokane, WA
Electrical, excavation, directional boring, and runway installation.

Jack Stand Tester Installation

October 2015 – August 2016

Utah Air National Guard Base
Salt Lake City, UT
Excavation, concrete, electrical, underground electrical services, and asphalt.

Seed Mixing System

July 2018 - May 2019

Ely, NV
Demo existing seed mixer, design and install new seed mixing batch plant.

Dugway Proving Grounds Roofing Project

May 2020 - Present

Provo, UT
Removed and replaced all roofing on Bldg. 4156 & 4143 of the Dugway Proving
Grounds.

Wetlands Wonder Walk Trail Bear River

June, 15 2020 - Present

Bear River, UT
Trinity oversaw the construction of an accessible, reinforced concrete Wetland Wonders
Walk Trail, including design & construction of wooden boardwalks across a slough. Both
the new concrete trail and new wooden boardwalk connected to an existing Trail.

Courthouse Annex Building Humidification

Ongoing

Salt Lake City, UT
Installation a total of 23 electrode humidifiers at each of the air handler units in the
building.

Asphalt Project

July 10, 2017 – Sept 21, 2017

Baumgartner Campground
Mountain Home, ID
Asphalt/Aggregate mix placement along campground sites and trails.